About us

Rénald Côté Inc was founded by Mr Rénald Côté more than 30 years ago. In 1998, it was sold to Mr Marc Labrie, an Innu civil engineering technician with nearly 20 years of experience related to civil engineering who, back then, worked for the company.

With the company’s growth in mind, two new associates, Mr Marc Riverin and Mr Michel Miller, both experienced regional contractors with conclusive professional successes, joined the enterprise. They also injected capital, guaranteeing successful growth.

The company then changed its name, becoming Rénald Côté 2007 Inc. Its new corporate structure welcomed Mr Riverin as CEO and Mr Mario Laberge, an experienced civil engineer who graduated from Sherbrooke University in 1982, as Vice President.

Mario Laberge has practiced civil engineering for more than 30 years and also uses his knowledge as a teacher at the Cégep de Baie-Comeau since 1991. He joined RCI’s crew as main estimator and project manager in 2007. He also becomes shareholder in 2009, ensuring a longer term leadership for future projects.

His diversified professional experience, acquired by doing client work for the Régie de la Santé et des Services Sociaux as well as by working as a designer and project manager for the engineering firm TMA and the general contractor Michel Miller inc, grant the company a broader vision of the many contractual relationships and expectations of each contributor within construction projects.

Mr Marc Riverin, by his exceptional client approach and his great expertise on many levels, is able to provide wise advice and rapidly becomes essential by offering incomparable professional services as shown by his implication in the Lac Bloom mining project in Fermont.

His professionalism as well as his availability allowed the enterprise to build a trusting relationship with the senior executives of the Consolidated Thompson Iron Mines Limitée mining company because he was able to quickly show them that he was an indispensable asset for their emerging business by his approach of different technical problems and his economical and efficient solutions.

Mr Michel Miller, the other shareholder of the company, retired of RCI in November 2013. He was eventually replaced by a few essential members of the current crew, consisting of more than five experienced engineers as well as skilled supervisory staff.

As emphasized by the Champions de la construction magazine in 2011, RCI has been named the company with the most hours worked in Quebec, as declared to the CCQ, for heavy equipment operators. Similarly, in 2013, RCI was ranked the construction company with the highest revenue growth in Canada with a rate of 2605 percent and an annual turnover of over 120 million. Its performance was highlighted by the PROFIT GUIDE .COM magazine.

Work history

PREVIOUS WORKS

2014

Ministère des Transports du Québec /
Intact Assurance
Chibougamau - Otish Mt. - Route 167 (32 km)
($20 000 000)

Arcelor Mittal
Surface run-off catchments.
($500 000)

Assi Construction
Fermont cafeteria earthwork.
($450 000)

2013

Yearly works
($81 000 000)

Arcelor Mittal
5th tailing line.
($1 500 000)

Arcelor Mittal
Preparatory work.
($3 000 000)

Arcelor Mittal
Piping and mechanical installation.
($2 400 000)

Cliffs
Fine and coarse tailing lines.
($4 000 000)

Cliffs
Dams and ditches.
($41 000 000)

Cliffs
Crushing for dams and ditches.
($2 000 000)

Cliffs
RCI mining service.
($8 200 000)

Ministère des Transports du Québec /
Intact Assurance
Chibougamau - Otish Mt. - Route 167 (40 km).
($23 000 000)

2012

Yearly works
($120 000 000)

Arcelor Mittal
Preparatory work.
- Earthwork / Thickening
- Field service
- Granular materials supply
($14 000 000)

Arcelor Mittal
Fire Lake mineral discharge dock.
($1 200 000)

Arcelor Mittal
On-site snow clearing.
($500 000)

Cliffs
315 KV electric sub-station.
- Preparatory work and granular materials supply
($2 000 000)

Cliffs
Reinforced soil wall.
- Building the mineral discharge area to the
new phase 2 crusher.
($5 000 000)

Cliffs
Surface conveyor earthwork.
- Existing dams correction and profiling
- Installation of two 28-inch process pipes.
($12 000 000)

2011

Yearly works
($95 000 000)

Arcelor Mittal
Preparatory work for the construction of a concentrator.
Setting up fire services and sewers.
($13 000 000)

Snow-clearing in Fermont
($3 500 000)

Cliffs
Surface conveyor earthwork.
Existing dams correction and profiling
Installation of two process pipes.
($8 000 000)

Cliffs
Construction of the crushed stone reclaim tunnel.
($2 000 000)

Cliffs
Construction of a bridge on Mazaré Lake.
($2 000 000)

Cliffs
Civil engineering works in Fermont.
($30 000 000)

Cliffs
Preparatory works for phase 2 of the Bloom Lake factory.
($500 000)

2010

Snow-clearing in Fermont
($1 800 000)

Consolidated Thompson
Civil engineering works in Fermont.
(Over $25 000 000)

Consolidated Thompson
Polishing dam extension.
($5 000 000)

Consolidated Thompson
Bloom Lake mine scouring.
($4 000 000)

Ministère des Transports du Québec
Route 389 rebuilding at km 500.
($3 960 000)

2009

Consolidated Thompson
Bloom Lake factory water intake.
($1 500 000)

Consolidated Thompson
Tailing trail and outlet pipe.
($2 000 000)

Consolidated Thompson
Civil engineering works.
($20 000 000)

Ministère des Transports du Québec
Colombier bridge repair.
($400 000)
 
Transelec (Hydro-Québec)
Dredging of the rights-of-way of Manic 1.
($300 000)

Centre régional Manicouagan
Snow-clearing at the CRM.
($80 000)

2008

Ministère des Transports du Québec
Ragueneau culvert repair.
($400 000)

Hydro-Québec
Snow-clearing of the Baie-Comeau services center.
($180 000)

Centre régional Manicouagan
Snow-clearing at the CRM.
($80 000)

Scieries Kruger
Tailing landfill cells in Ragueneau & Longue-Rive.
($2 300 000)